Shahdakot Qubba Saeed Khan Section of Gawader-Ratodero Motorway for National Highway Authority (NHA) PDF Print E-mail

Gawadar Ratodero Shahdad Kot

 Image
 
ClientNational Highway Authority
Cost963 million
Length64 km


National Highway Authority has appointed A.A. Associates, for planning and design and construction supervision of Shahdakot Qubba Saeed Khan Section of Gawader - Ratodero Motorway The project consists of 64 km long road which is a part of 654 km long Gawadar- Ratodero project. This is 7.30 meter wide 2 lane road with 3.0 meter wide paved shoulders including 5 Bridges and 154 Culverts. The services provided include planning and design of the project with preparation tender documents and detailed construction supervision. The estimated cost of the project is Rs 1081 million The services provided include planning and design of the project with preparation tender documents and detailed construction supervision.